Assembly
Our specialists guide you through the whole construction. Local workforce or with a Frisomat old hand, we provide detailed plans, manuals and professional guidance all the way.
High quality steel constructions. Everywhere.
Thanks to the lightweight materials, less people are required to construct your building. From 2 days to 2 months. Fast and flexible. No heavy material or cranes are needed. Every part can be manipulated by 2 people. That's the Frisomat philosophy. Innovative steel constructions to facilitate the builders.
Delivering a steel shell is not the end of our involvement. It does not stop when the structure, fittings and claddings have been assembled. Insulation, doors, windows, gates, dock shelters,… everything wears the Frisomat stamp.
Your advantage?
- Fast, high quality construction
- A professional job
- No surprises
- No heavy machinery
- Uncomplicated machinery
- Uncomplicated plans and manual
- Uncomplicated unloading
- Uncomplicated assembly on the floor
- Uncomplicated assembly above the ground
- Reliable calculated structures by top of the art engineers
- No dependency
- A cost-efficient investment
- No surprises
- No worries